Substation Erection Contractor: Turnkey AIS and GIS Substations from 11kV to 440kV
Tachyons Energy Private Limited is a substation erection and EPC contractor for air-insulated (AIS) and gas-insulated (GIS) substations at 11kV, 33kV, 66kV, 110kV, 220kV and 440kV. It erects switchyard structures and equipment, lays the earth mat, strings busbars, wires control and relay panels and carries out pre-commissioning tests through to energisation, for utilities, industries and generation plants. The company is based in Kerala, India.
A substation transforms and switches power between voltage levels. At 11kV and 33kV it is typically a distribution or HT intake substation for an industry or a secondary network; 66kV and 110kV are sub-transmission and transmission levels; 220kV and 440kV are EHV (extra-high-voltage) grid substations. Bus schemes, equipment and clearances change with each class, from a single bus at 11kV to double-bus or one-and-a-half breaker arrangements at the EHV end, as set by the utility specification.
11kV: indoor VCB panels or RMUs, distribution transformers and metering
33kV: 33/11kV substations and large industrial intakes with outdoor or indoor breakers
66kV: sub-transmission bays with SF₆ breakers, isolators and power transformers
110kV: transmission bays with CVTs, wave traps for PLCC and distance protection
220kV: grid substations with auto-transformers, double-bus interlocking and SCADA
440kV: EHV nodes with auto-transformers, shunt reactors and corona-controlled hardware
AIS and GIS: choosing the substation type
In an air-insulated substation (AIS), live parts are insulated by atmospheric air and separated by clearances, so the yard needs more land but equipment is accessible and familiar to maintain. A gas-insulated substation (GIS) encloses the busbars and switchgear in earthed metal housings filled with insulating gas, commonly SF₆, which makes the bay far more compact. GIS is usually chosen for urban, indoor, space-constrained, coastal or polluted sites; AIS remains common for outdoor grid and distribution substations where land is available.
Switchyard equipment erection
Tachyons Energy erects the complete switchyard to the approved layout and manufacturer instructions, with hold points for levels, torque, clearances and orientation. For GIS, module assembly is carried out in a clean area under OEM supervision, followed by gas evacuation, filling and moisture checks.
Gantries and equipment support structures, plumbed and torqued
Power transformers: placement, bushings, radiators, conservator, vacuum oil filling and filtration
SF₆ and vacuum circuit breakers, isolators and earth switches with interlocks
CTs, PTs, CVTs, lightning arresters and wave traps
Rigid or strung busbars, conductor stringing to sag-tension charts and jumpering
Earth-mat grid to the earthing design, with risers to every structure
Control cabling, marshalling kiosks and control and relay panel termination
Testing, approval and energisation
Before a substation is charged, every item of equipment and every protection scheme is tested and recorded. The installation is then submitted for inspection by the State Electrical Inspectorate against CEA safety regulations, and energised under a switching programme agreed with the utility.
Insulation resistance, contact resistance and circuit breaker timing
Transformer ratio, winding resistance, vector group, tan delta and oil BDV
CT and PT ratio and polarity, primary and secondary injection
Interlock, scheme and SCADA point-to-point checks
Earth-mat resistance measurement
As-built drawings, relay settings files and test reports at handover
HOW THE WORK RUNS
How we deliver substation erection
01
Survey and engineering review
Site survey, review of the single-line diagram, layout, earthing design and utility specification, and planning of access, lifting and equipment storage.
02
Civil foundations and earth mat
Equipment and gantry foundations, cable trenches and the earth-mat grid laid and jointed before backfilling, with levels and bolt templates checked.
03
Structure and equipment erection
Gantries and structures erected, then transformers, breakers, isolators, instrument transformers, arresters and wave traps mounted and aligned.
04
Busbars, stringing and control cabling
Busbars and conductors installed with sag and clearance checks; control and power cables laid and terminated at kiosks, CRPs and auxiliary boards.
05
Pre-commissioning tests
Equipment tests, primary and secondary injection, interlocks and SCADA checks, with a punch list closed before inspection.
06
Inspection and energisation
Inspectorate approval, switching programme with the utility, soak period and on-load checks of protection, metering and SCADA values.
QUESTIONS & ANSWERS
Substation Erection: common questions
Straight answers to what clients ask us most before a project starts.
What does a substation erection contractor do?
A substation erection contractor installs the equipment that makes up a substation: support structures, transformers, circuit breakers, isolators, instrument transformers, lightning arresters, busbars, earthing and control cabling. The contractor also tests the installation and supports statutory inspection before energisation. On a turnkey EPC contract, engineering, procurement coordination and civil works can be part of the same scope.
How long does a 33kV substation take to build?
Duration depends mainly on the delivery lead time of the power transformer and switchgear, the extent of civil works, site access and weather, and the time taken for utility and inspectorate approvals. Whether the substation is indoor or outdoor, and whether it is a new site or an extension of an existing one, also matters. A realistic schedule is set after the survey, once equipment delivery dates are known.
What is the difference between an AIS and a GIS substation?
An air-insulated substation (AIS) uses open air as the insulation between live parts, which needs large clearances and more land. A gas-insulated substation (GIS) encloses the conductors and switchgear in earthed metal enclosures filled with insulating gas, commonly SF₆, making it much more compact. GIS typically costs more in equipment but suits urban, indoor and polluted sites where space or contamination is a constraint.
What is an EHV switchyard?
An EHV (extra-high-voltage) switchyard is the outdoor or enclosed switching area of a substation operating at transmission voltages, typically 220kV and above in Indian practice. It contains circuit breakers, isolators, instrument transformers, arresters, busbars and line or transformer bays. EHV yards need larger clearances, heavier equipment handling and more extensive testing than distribution substations.
Who approves a new substation before it is energised?
In India, a new substation is inspected by the Electrical Inspectorate (state or central, depending on the installation) against the CEA safety regulations before it can be charged. The utility or transmission licensee also checks protection, metering and interface requirements for connection. The contractor prepares the test reports and drawings and supports the inspection.
Which voltage levels does Tachyons Energy work on?
Tachyons Energy erects substations and switchyards at 11kV, 33kV, 66kV, 110kV, 220kV and 440kV, in both AIS and GIS configurations. The same scope covers control and relay panel wiring, cabling and testing for each voltage class.